🏗️ Construction Weather - Gori

Specialized weather analysis for construction work and 7-day work planning

7.1°C
No Precipitation

Safe Working Conditions

Suitable conditions for all construction work

🏗️

Concrete Work

100
/ 100
🏠

Roofing Work

100
/ 100
🏗️

Crane Work

100
/ 100
🌤️

Outdoor Work

100
/ 100
🎨

Painting Work

75
/ 100

☔ Precipitation & Temperature

Precipitation Amount: 0.0 mm
Precipitation Hours: 0 hours
Min/Max Temperature: 2.1° / 12.1°
Night Temperature: 6.7°C

💨 Wind & Visibility

Average Wind: 4.3 km/h
Maximum Wind: 18.4 km/h
Visibility Distance: 41.6 km

💧 Humidity & UV

Average Humidity: 61%
Humidity Range: 40% - 78%
Dew Point: 1.2°C
UV Index: 2.2

📅 7-Day Construction Work Plan

Date Weather Temperature Precipitation Wind Concrete Roofing Crane Safety
1 Dec
Monday
☀️
12°
0.0mm 18 km/h
100
100
100
2 Dec
Tuesday
🌧️
10°
0.5mm 75 km/h
80
0
0
🟠
3 Dec
Wednesday
💨
12°
0.0mm 38 km/h
55
47
60
⚠️
4 Dec
Thursday
💨
11°
0.0mm 50 km/h
55
20
0
🟠
5 Dec
Friday
💨
10°
0.0mm 48 km/h
55
20
0
🟠
6 Dec
Saturday
☀️
13°
0.0mm 20 km/h
70
100
100
7 Dec
Sunday
☀️
14°
0.0mm 15 km/h
70
100
100

✅ Best Working Days

Concrete Work:

1 Dec (100), 2 Dec (80), 6 Dec (70)

Roofing Work:

1 Dec (100), 6 Dec (100), 7 Dec (100)

Crane Work:

1 Dec (100), 6 Dec (100), 7 Dec (100)

Outdoor Work:

1 Dec (100), 3 Dec (100), 4 Dec (100)

Painting Work:

1 Dec (75), 7 Dec (75), 3 Dec (45)

📊 Weekly Work Outlook

Safe Days: 3 days
Caution Days: 1 days
Warning Days: 3 days
Dangerous Days: 0 days

Total Workable: 4 / 7 days